SB / CASE STUDIES
Technology standardisation, +30% productivity and −35% downtime
AGD · Food · Latin America · since 2019
Challenge: one of Latin America's largest food producers, with HFFS packaging machines on obsolete Omron PLCs and mixed technologies, hard to maintain and exposed to long stops.
- Plant-wide technology standardisation
- Retrofit of every HFFS from obsolete Omron to Rockwell
- Consulting and advice on new machinery purchases
- Productivity increase of around 30%
- Unplanned downtime cut by more than 35% in under 2 years
- Supplier coordination and critical-stock study
- Training for maintenance and production staff
More case studies
- Food · FMCG · Latin America · end userFull HFFS electronic retrofit: Omron to Rockwell, OEE from 68% to 96%
- FMCG · worldwidePhased improvement plan
- Industry · pressMitsubishi PLC migration to Siemens S7-1200
- Retrofit · no drawingsLine with legacy Omron PLC
- Automotive · batteries · electronic retrofitMitsubishi to Siemens migration on a nearly 40-year-old battery line
- Packaging · leading builder · since 2020Automation engineer for a leading packaging machine builder
- Special machinery · aerospace · 2025Robotic cell for carbon-fibre braiding
- Foundry · machine builder · 2023–2024New machinery connected with SBTrack
- Pressure vessels · mining · Indonesia · 2024–2025Vacuum drying system
Facing a similar challenge?
Tell us the problem and we'll propose a plan.