Vacuum drying system
Pressure vessels · mining · Indonesia · 2024–2025
Challenge: develop and commission the control of a vacuum dryer for a mining end user in Indonesia, integrated with the plant DCS.
- Siemens PLC and Comfort HMI
- Coordination of local teams for the electrical installation
- Control system fine-tuning
- PROFINET communication with the plant DCS
More case studies
- AGD · Food · Latin America · since 2019Technology standardisation, +30% productivity and −35% downtime
- Food · FMCG · Latin America · end userFull HFFS electronic retrofit: Omron to Rockwell, OEE from 68% to 96%
- FMCG · worldwidePhased improvement plan
- Industry · pressMitsubishi PLC migration to Siemens S7-1200
- Retrofit · no drawingsLine with legacy Omron PLC
- Automotive · batteries · electronic retrofitMitsubishi to Siemens migration on a nearly 40-year-old battery line
- Packaging · leading builder · since 2020Automation engineer for a leading packaging machine builder
- Special machinery · aerospace · 2025Robotic cell for carbon-fibre braiding
- Foundry · machine builder · 2023–2024New machinery connected with SBTrack
Facing a similar challenge?
Tell us the problem and we'll propose a plan.