Challenge: fully modernise the control of an automotive battery production line for a leading manufacturer, with two obsolete Mitsubishi PLCs, a separate S7-1200 for filling and external temperature and safety controllers.
- New electrical cabinet centralising all control
- Architecture with Siemens 1512SP F-1 safety CPU, IM 155, Comfort HMI and Basic HMI
- Safety and temperature control integrated into the central CPU
- Profibus communication with the plant's central S7-400 PLC
- New software functions to raise productivity
- Supplier coordination and on-schedule restart with minimal downtime
More case studies
- AGD · Food · Latin America · since 2019Technology standardisation, +30% productivity and −35% downtime
- Food · FMCG · Latin America · end userFull HFFS electronic retrofit: Omron to Rockwell, OEE from 68% to 96%
- FMCG · worldwidePhased improvement plan
- Industry · pressMitsubishi PLC migration to Siemens S7-1200
- Retrofit · no drawingsLine with legacy Omron PLC
- Packaging · leading builder · since 2020Automation engineer for a leading packaging machine builder
- Special machinery · aerospace · 2025Robotic cell for carbon-fibre braiding
- Foundry · machine builder · 2023–2024New machinery connected with SBTrack
- Pressure vessels · mining · Indonesia · 2024–2025Vacuum drying system
Facing a similar challenge?
Tell us the problem and we'll propose a plan.